logo
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Chongqing Linde Technology Development Co., Ltd.

Sales & Support:

Home ProductsWastewater Treatment System

Electroplating Industrial Wastewater Treatment Systems , Waste Water Purification System

China Chongqing Linde Technology Development Co., Ltd. certification
China Chongqing Linde Technology Development Co., Ltd. certification
Okay of all the companies that I have quoted you are the most reasonable not for price it is consisten I thank you for the time I hope to have this week good news to be able to buy this machine

—— Emmanuel from Chile

We have been doing business with Linde company for many years with high performance-cost and friendly service , such a honest factory, product are good !

—— Moses from Kenya

I love Boiler Water Treatment System, its easy operation and i can get the ultrapure water as i want. Their price is pretty good

—— David Smith

I'm Online Chat Now

Electroplating Industrial Wastewater Treatment Systems , Waste Water Purification System

Electroplating Industrial Wastewater Treatment Systems , Waste Water Purification System
Electroplating Industrial Wastewater Treatment Systems , Waste Water Purification System

Large Image :  Electroplating Industrial Wastewater Treatment Systems , Waste Water Purification System

Product Details:

Place of Origin: China
Brand Name: Linde
Certification: ISO9001, CE, SGS

Payment & Shipping Terms:

Minimum Order Quantity: Negotiable
Price: Negotiable
Packaging Details: Export standard wooden case(plywood), no need to fumigate, suitable for shipping.
Delivery Time: 1-7working days(depand on raw materials stocking)
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: >300sets/month
Detailed Product Description
Product Name: Electroplating Wastewater Treatment System Feature: Easy Operation
Application: Electroplating Specification Model: Professional Customization
Color: As Requested Process: Ootional
Highlight:

waste water filtration system

,

waste water purification system

Electroplating wastewater treatment equipment Easy Operation

 

 

Background:

The composition of electroplating wastewater is very complicated. Except for cyanide-containing (CN-) wastewater and acid-base wastewater, heavy metal wastewater is a potentially hazardous wastewater category in the electroplating industry. According to the classification of heavy metal elements contained in heavy metal wastewater, it can be generally divided into chromium (Cr) wastewater, nickel (Ni) wastewater, cadmium (Cd) wastewater, copper (Cu) wastewater, zinc (Zn) wastewater, Gold-containing (Au) wastewater, silver-containing (Ag) wastewater, and the like.

 

1) Equipment name: Electroplating wastewater treatment equipment

2) Use occasions: electronics factory, electroplating industry, auto parts manufacturing.

 

3) Flow chart:

 

Electroplating Industrial Wastewater Treatment Systems , Waste Water Purification System 0

 

 

4) Process Description: Basically use alkali (caustic or lime), polyaluminum chloride (PAC) and organic flocculant (PAM), the pH value of the integrated water is mentioned as 10~13, the alkali concentration is large and the alkali and heavy metals are forced. The reaction proceeds to form a hydroxide for flocculation precipitation. Subsequent use of chlorine dioxide to strongly oxidize the effluent to remove harmful substances such as heavy metals and cyanide in the water.

 

 

5) Advantages: It is buried below the surface of the earth. The surface above the equipment can be used as greening or other land. It does not need to build houses, heating and heat preservation. Fully automatic electrical control system and equipment fault alarm system, safe and reliable operation. It has excellent properties such as corrosion resistance and aging resistance. Simple construction and easy operation

 

6) Supply (cooperation) mode and delivery cycle

1: Determine the usage scenario.

2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)

3: Determine the treatment process.

4: The supplier forecasts the price duration and governance objectives of the equipment or system.

5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.

6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.

8: System training for equipment use and maintenance.

Electroplating Industrial Wastewater Treatment Systems , Waste Water Purification System 1

Contact Details
Chongqing Linde Technology Development Co., Ltd.

Contact Person: Ms. Xiang

Tel: +86 139 8384 9337

Send your inquiry directly to us (0 / 3000)