logo
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Chongqing Linde Technology Development Co., Ltd.

Sales & Support:

Home ProductsWastewater Treatment System

Printing Wastewater Treatment System Easy Operation Custom Color Petroleum

China Chongqing Linde Technology Development Co., Ltd. certification
China Chongqing Linde Technology Development Co., Ltd. certification
Okay of all the companies that I have quoted you are the most reasonable not for price it is consisten I thank you for the time I hope to have this week good news to be able to buy this machine

—— Emmanuel from Chile

We have been doing business with Linde company for many years with high performance-cost and friendly service , such a honest factory, product are good !

—— Moses from Kenya

I love Boiler Water Treatment System, its easy operation and i can get the ultrapure water as i want. Their price is pretty good

—— David Smith

I'm Online Chat Now

Printing Wastewater Treatment System Easy Operation Custom Color Petroleum

Printing Wastewater Treatment System Easy Operation Custom Color Petroleum
Printing Wastewater Treatment System Easy Operation Custom Color Petroleum

Large Image :  Printing Wastewater Treatment System Easy Operation Custom Color Petroleum

Product Details:

Place of Origin: China
Brand Name: Linde
Certification: ISO9001, CE, SGS

Payment & Shipping Terms:

Minimum Order Quantity: Negotiable
Price: Negotiable
Packaging Details: Export standard wooden case(plywood), no need to fumigate, suitable for shipping.
Delivery Time: 1-7working days(depand on raw materials stocking)
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: >300sets/month
Detailed Product Description
Product Name: Printing Wastewater Treatment Equipment Feature: Easy Operation
Application: Printing Specification Model: Professional Customization
Color: As Requested Field: Petroleum
Highlight:

wastewater treatment plant

,

waste water purification system

Printing Wastewater Treatment System Easy Operation Custom Color Petroleum

 

 

5.6 Printing wastewater treatment equipment

 

 

Supply (cooperation) method and delivery cycle

1: Determine the usage scenario.

2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)

3: Determine the treatment process.

4: The supplier forecasts the price duration and governance objectives of the equipment or system.

5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.

6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.

8: System training for equipment use and maintenance.

 

Advantages:

stable operation, enhanced quick-setting, adsorption and decolorization slag removal method, stable and reliable and durable.

Our equipment automatically discharges slag while treating sewage without manual intervention. The fully enclosed filtration operation greatly improves the big problem of the operating environment. It saves the time of conventional sewage treatment and also improves the operating conditions. This product adopts imported system and fully automatic filtering equipment, and the operation requirements are fine.

 

1) Equipment Name: Printing Wastewater Treatment Equipment

2) Use occasions: widely used in petroleum, chemical, printing and dyeing, paper making, oil refining and other sewage treatment

 

3) Equipment picture:

Printing Wastewater Treatment System Easy Operation Custom Color Petroleum 0

Printing Wastewater Treatment System Easy Operation Custom Color Petroleum 1

 

Flow chart:

Printing Wastewater Treatment System Easy Operation Custom Color Petroleum 2

 

 

 

Installation site picture:

Printing Wastewater Treatment System Easy Operation Custom Color Petroleum 3

 

Supply (cooperation) mode and delivery cycle

1: Determine the usage scenario.

2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)

3: Determine the treatment process.

4: The supplier forecasts the price duration and governance objectives of the equipment or system.

5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.

6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.

8: System training for equipment use and maintenance.

 

 

 

 

Contact Details
Chongqing Linde Technology Development Co., Ltd.

Contact Person: Ms. Xiang

Tel: +86 139 8384 9337

Send your inquiry directly to us (0 / 3000)