Product Details:
Payment & Shipping Terms:
|
Product Name: | Printing Wastewater Treatment Equipment | Feature: | Easy Operation |
---|---|---|---|
Application: | Printing | Specification Model: | Professional Customization |
Color: | As Requested | Field: | Petroleum |
Highlight: | wastewater treatment plant,waste water purification system |
Printing Wastewater Treatment System Easy Operation Custom Color Petroleum
5.6 Printing wastewater treatment equipment
Supply (cooperation) method and delivery cycle
1: Determine the usage scenario.
2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)
3: Determine the treatment process.
4: The supplier forecasts the price duration and governance objectives of the equipment or system.
5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.
6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.
7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.
8: System training for equipment use and maintenance.
Advantages:
stable operation, enhanced quick-setting, adsorption and decolorization slag removal method, stable and reliable and durable.
Our equipment automatically discharges slag while treating sewage without manual intervention. The fully enclosed filtration operation greatly improves the big problem of the operating environment. It saves the time of conventional sewage treatment and also improves the operating conditions. This product adopts imported system and fully automatic filtering equipment, and the operation requirements are fine.
1) Equipment Name: Printing Wastewater Treatment Equipment
2) Use occasions: widely used in petroleum, chemical, printing and dyeing, paper making, oil refining and other sewage treatment
3) Equipment picture:
Flow chart:
Installation site picture:
Supply (cooperation) mode and delivery cycle
1: Determine the usage scenario.
2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)
3: Determine the treatment process.
4: The supplier forecasts the price duration and governance objectives of the equipment or system.
5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.
6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.
7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.
8: System training for equipment use and maintenance.
Contact Person: Ms. Xiang
Tel: +86 139 8384 9337