logo
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Chongqing Linde Technology Development Co., Ltd.

Sales & Support:

Home ProductsWastewater Treatment System

Landfill Leachate Wastewater Management System , Wastewater Treatment Unit PH Adjustment

china Chongqing Linde Technology Development Co., Ltd. certification
china Chongqing Linde Technology Development Co., Ltd. certification
Okay of all the companies that I have quoted you are the most reasonable not for price it is consisten I thank you for the time I hope to have this week good news to be able to buy this machine

—— Emmanuel from Chile

We have been doing business with Linde company for many years with high performance-cost and friendly service , such a honest factory, product are good !

—— Moses from Kenya

I love Boiler Water Treatment System, its easy operation and i can get the ultrapure water as i want. Their price is pretty good

—— David Smith

I'm Online Chat Now

Landfill Leachate Wastewater Management System , Wastewater Treatment Unit PH Adjustment

Landfill Leachate Wastewater Management System , Wastewater Treatment Unit PH Adjustment
Landfill Leachate Wastewater Management System , Wastewater Treatment Unit PH Adjustment

Large Image :  Landfill Leachate Wastewater Management System , Wastewater Treatment Unit PH Adjustment

Product Details:

Place of Origin: China
Brand Name: Linde
Certification: ISO9001, CE, SGS

Payment & Shipping Terms:

Minimum Order Quantity: Negotiable
Price: Negotiable
Packaging Details: Export standard wooden case(plywood), no need to fumigate, suitable for shipping.
Delivery Time: 1-7working days(depand on raw materials stocking)
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: >300sets/month
Detailed Product Description
Product Name: Landfill Leachate Treatment System Feature: Easy Operation
Application: Landfill Leachate Treatment Specification Model: Professional Customization
Warranty: 1 Year Weight: OEM
Highlight:

wastewater treatment plant

,

waste water purification system

High Automation Landfill Leachate Treatment System PH Adjustment

 

 

Background:

The treatment of leachate from municipal landfills has been a very difficult problem in landfill design, operation and management. Leachate is the product of gravity flow of liquid in landfills, mainly from precipitation and internal water content of the waste itself. The nature of the leachate varies over a considerable range due to many factors in the flow that may affect the properties of the leachate, including physical, chemical, and biological factors.

 

Generally, the pH value is between 4 and 9, the COD is in the range of 2000 to 62000 mg/L, and the BOD5 is from 60 to 45,000 mg/L. The concentration of heavy metals is substantially the same as the concentration of heavy metals in municipal sewage. Municipal landfill leachate is a high-concentration organic wastewater with complex composition. If it is discharged into the environment without treatment, it will cause serious environmental pollution.

 

 

Process flow chart:

Landfill Leachate Wastewater Management System , Wastewater Treatment Unit PH Adjustment 0

 

 

Process Description:

The landfill leachate treatment process includes wastewater treatment, coagulation air flotation or sedimentation, ammonia nitrogen stripping, biochemical treatment, pH adjustment, microwave oxidation, neutralization and flotation, filtration and discharge, etc.

 

The treatment part adopts the biological enzyme technology and the deep oxidation treatment part adopts the microwave oxidation technology, which improves the treatment efficiency of the biological treatment part, reduces the sludge reflux process, and does not produce concentrated liquid after the advanced treatment, and has no secondary pollution, so that the landfill leachate Processing costs are reduced.

 

Field equipment picture :

Landfill Leachate Wastewater Management System , Wastewater Treatment Unit PH Adjustment 1

Landfill Leachate Wastewater Management System , Wastewater Treatment Unit PH Adjustment 2

 

 

Supply (cooperation) mode and delivery cycle

1: Determine the usage scenario.

2: Analyze the quality of contaminated water (if necessary, do laboratory analysis)

3: Determine the treatment process.

4: The supplier forecasts the price duration and governance objectives of the equipment or system.

5: The supplier and the buyer negotiate the price duration and the governance objectives, negotiate the contract, and sign the contract and pay the supplier prepayment.

6: After the equipment is produced and paid by the buyer and its agent, the payment will be made.

7: The supplier rushed to the place of use of the buyer for installation instructions and commissioning.

8: System training for equipment use and maintenance.

 

Advantages: good effluent water quality, stable water discharge, flexible operation, small floor space, high automation, easy operation and mobility, and strong mobility.

 

Contact Details
Chongqing Linde Technology Development Co., Ltd.

Contact Person: Ms. Xiang

Tel: +86 139 8384 9337

Send your inquiry directly to us (0 / 3000)